SOLAR READINESS
Should you restore your roof before solar goes on?
If the roof under a planned array has less life left than the panels, deal with the roof first: if it fails first, the panels have to come off before it can be fixed. An on-site assessment decides whether that roof can be restored or needs replacing.

Why the roof decision comes before the racking design
Racking, attachments and wiring are all laid out on the roof as it is today. Once the array is down, much of the roof sits under panels, and any repair beneath them starts with taking panels off and ends with putting them back. Settling the roof first means the array is designed around a roof whose condition is already known and dealt with.
What to settle before signing the installation contract
- The roof type, and its age if you know it.
- Known leaks and the repair history.
- Where water ponds after rain.
- Existing penetrations, and the new ones the array will add.
- Who keeps the roof documentation. The owner and the installer both receive the handover file.
Restore or replace first
A roof that is still sound can usually be restored under the array; one that has failed across too much of its area is replaced instead. How that call is made is set out in the restore-or-replace guide.
Warranty
Qualifying restored roofs can carry a 10, 15 or 20-year manufacturer system warranty. The terms and what each term requires are on the warranty page.
Working with your installer
NanoGuard does not install panels. We prepare and restore the roof, time the work to the install date, and agree attachment and penetration locations with your installer before restoration starts.
See how a project runs on the solar readiness page. Installers who want to work with us can start on the partners page.
Your next step
Send the building address, your planned install date and anything from the checklist above that you already know. We will book the roof assessment around your installer's schedule.
Questions
Should the roof work happen before or after the array is designed?
Before. The roof is assessed and, where it qualifies, restored first, with the work timed to the install date so the installer arrives to a finished roof.
Is the solar-readiness assessment free?
The on-site visual assessment is free. If the moisture or insulation condition needs testing, a full condition assessment is quoted separately; the commercial roof assessment guide explains the difference.
Does restoring the roof mean tearing it off?
No. Where the roof qualifies, the restoration system goes over the existing roof instead of replacing it.
